On May 15th, the Going Into Operation Ceremony for Tangshan Lerthai city project which was contracted by the No.3 Designing Division was held. Tangshan municipal government leaders, Lubei District government leaders, President of board of directors for China Lerthai commercial real estate corporation and Lerthai share-holding Ltd, Mr Yang Longfei as well as other senior corporate leaders attended the event, president Wang Chunyan of TPADRI attended the ceremony as invited. The 700 domestic and foreign distinguished guests from the real estate industry all witnessed the sensational moment.
Tangshan Lerthai city project is now located to the north of Beixinxi Road and the east of West Outer Ring, consisting of two constructional stages. It covers a total constructional area of 462,000 square meters, including above ground area of 420,000 square meters as well as 42,000 square meters of underground constructional area, The volume rate of it is 3.58. At present, TPADRI No.3 Division is working on the design of phase 1 of the project namely area A-02, the above ground constructional area is approximately 175,000 square meters. The building boasts 8 high-rise buildings (the highest being 33 floors), achieving the constructional height of 99.8 meters, the two-story along street shops section(designed according to the commercial servicing net), the commercial section on second floor of the west side of the building channeling one side of the commercial complex through a porch, together with the entire design of the underground garage.
In order to build Lerthai city into the city complex with the largest capacity, the highest taste, as well as the best business posture, during the beginning phase of the project, the designing staff followed TPADRI leaders traveling to visit Shijiazhuang Lerthai city project, absorbed valuable experience. After completion, Tangshan Lerthai city project, will greatly improve the functions of the city , the embellishment of city image as well as tangshan's economic development.